Wednesday, February 18, 2009

Mid-week

There are two types of progress - one that is obvious and one that exists behind the scenes. Weeks of paint preparations seem to disappear when the final coat of paint is applied. Seems like magic.

Erin is seen here in this picture dusting off. She has been in the forward accommodations on Merva for a while now. As you can see she really gets into her work.

Erin is seen doing the final details in preparation for paint.

Here is Theresa after sanding massive amounts of white paint. Way to go Theresa!

Balandra has been getting some attention - new house sides and canvas on top. She is looking really smart. The rigging has arrived from Yachtech. There is nothing like fresh stainless steel wire and turnbuckles. We have uncovered all the bronze hardware that was painted over. We are pleased to be a part of uncovering her beauty. I can't wait to see her back in the water and sailing in Brentwood Bay, if there is any wind!

Tuesday, February 10, 2009

Merva

Merva's side decks getting re-fastened and plugged


Forward accommodations or Erin's cave


This is the deck head that Theresa has been working on. It would have saved alot of time if we could have flipped the boat over.

We are pealing back the years on Merva. Every layer of paint on the interior represents a lifetime. If only the paint could talk. Stripping paint has become the bulk of the work.
The decks are getting new plugs, seams and fasteners. The trim is going back on and the bronze is getting polished. The engine is on it's way, the electrical is getting planned and Donell is hanging out at the bronze foundry. You could say we are in the thick of it now. I'm starting to imagine her on the water. She is going to look fabulous.

Wednesday, January 28, 2009

Super Dave


Dave removing the lead out of Merva. Lets count 5 lead ingots x 60lbs a piece = 300lbs. Good thing we are up to date with WCB.

Duen


Inside the Duen is Jean. He is fitting in the new inner stem piece.
Low impact- repair.

Here is a Norwegian sailboat built in 1939. Duen has worked her whole life . For the past 25 years she has belonged to a good friend. Duen has sailed around the world and presently she spends her winters here and summers in the Queen Charlotte Islands. Jean and I have been involve in many major projects on her over the past 10 years. This is the latest. The planking is Pine from Norway and has done remarkably well. The decay was localized.

Bronze and then some.


A solid cast rudder and the prop for Merva.

Canvas

This is Merva getting covered in canvas. This is one of my favorite jobs as a boatbuilder. It is just so satisfying to cover something with a consistent white blanket. We stretch the canvas by hand and staple it temporarily until we are satisfied with how it looks. Then we use copper nails and pull out the staples as they are made of steel and would rust at some point.

This is Erin laying out the canvas.



Here I am brushing off some copper nail clippings after we have stretched the canvas.
After trimming, we fill the weave of the canvas with many coats of paint.


Saturday, January 17, 2009

Dream Boat



On Friday we finally had the chance to sea trial Dream Boat. This 42' Mathews is in bristol condition. The list of projects include, Paint, Stem repair, New transom and supporting structure, re-alinding the engined and engine supports. New shafts, bearings and re-align the struts. There is more. Dream Boat was a joy to operate.